Work to complete Machinery Spaces Aft of Engine Room Rebuild (Spring 2005)

This is the list of projects to finish off the aft machinery spaces. Much has been done, these are the detailed list of things to complete. 

Important things to get done.

  1. [   0% Complete] Mount compressor for fridge (Two Screws)
  2. [   0% Complete] Reroute/Install power feed for new autopilot mounting position
  3. [   0% Complete] Reroute/Install seatalk cable for new autopilot mounting position
  4.  

    "B" List

  1. [   0% Complete] Move Yaw rate transducer to aft engine bulkhead and reroute cable
  2. [   0% Complete] Trim Quadrant cables
  3. [   0% Complete] Vented loop for Damage Control Pump (2" water line)
  4. [   0% Complete] Clean base and remount watermaker, replace barb fitting and repickle
  5. [   0% Complete] Install backing plates for Tow/Drogue attachments
  6. [   0% Complete] Remote secondary 110 V power feed box
  7. [   0% Complete] Obtain and mount ST1000 autopilot power feed/seatalk line
  8. [   0% Complete] Beef up temporary turning block mounts for quadrant
  9. [   0% Complete] Rebuild electric bilge pumps
  10. [   0% Complete] Rebuild Exhaust fitting on transom
  11. [   0% Complete] Pod on helm for autopilot head, windlass control, vhf radio head, stereo control
  12. [   0% Complete] Replace corroded clamps on exhaust hose
  13. [   0% Complete] Rework watermaker filter and line assembly
  14. [   0% Complete] Rebuild quadrant turning block assembly
  15. [   0% Complete] Reposition rudder angle transducer (reroute cables) to protect from cockpit locker
  16. [   0% Complete] Install cockpit hard points
  17. [   0% Complete] install aft sail tracks
  18. [   0% Complete] install high power RF feed through on aft deck
  19. [   0% Complete] install teak door at aft end of quarterberth
  20. [   0% Complete] have refrigeration unit serviced due to low charge
  21. [   0% Complete] rewire compressor control circuit to terminal block instead of quick couplers
  22. [   0% Complete] reblumb watermaker to avoid air entrainment
  23. [   0% Complete] install self steering vane turning blocks
  24. [   0% Complete] install shelf over transom exhaust lines to facilitate access/storage
  25. [   0% Complete] reroute wiring from propane control locker to controller
  26. [   0% Complete] reblumb washdown pump in cockpit
  27. [   0% Complete] epoxy propane inlet

 

    Hardware movement for painting

  1. Galvanic Isolators
  2. Cockpit Bilge Pump
  3. Antenna Tuner
  4. Propane Control Locker
  5. Watermaker Filter Assembly
  6.  Primary Bilge Pump
  7. Engine Water Strainer
  8. Quadrant and Steering Gear
  9. Water lift Muffler
  10.  
  11.